Chassis surface table is precision ground to within .001-inch.
This allows for the foundation of the car to be built perfectly flat.
The entire chassis will be final welded while clamped to this fixture.
 TimMcAmisPro10100 |  TimMcAmisPro10200 |
---|
After the floor section is completely fit and welded the cab of the chassis goes up next. These images are the main hoop and dash bar set up with fixtures.
 TimMcAmisPro10300 |  TimMcAmisPro10400 |
---|
With the cab of the chassis now completed the four link brackets can now be installed. These are machined brackets that are adjustable at .125” increments. This is very crucial for getting the perfect setting without changing the ride height of the car.
 TimMcAmisPro10500 |  TimMcAmisPro10600 |
---|
 TimMcAmisPro10700 |
---|
Titanium tail section is now completed. This is attached to the main chassis section with a double sleeve and will be bolted through with titanium fasteners.